Project Calendar

Project Risk Optimization Strategic Approaches Formats PDF
This slide comprises different ways to assess portfolio risk in order to make asset allocation and security selection decisions. Some of the best practices include portfolio standard deviation, shortfall risk, tracking error, Sharpe ratio, and beta. Persuade your audience using this Project Risk Optimization Strategic Approaches Formats PDF. This PPT design covers five stages, thus making it a great tool to use. It also caters to a variety of topics including Portfolio Standard Deviation, Shortfall Risk, Tracking Error. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.

Project Management Methods And Methodologies Ppt Slides
This is a project management methods and methodologies ppt slides. This is a six stage process. The stages in this process are propose, define, design, develop, test, conclude, propose, requirements, site map, wireframes, use cases, graphic design, technical architecture, logical design, physical design, system components, unit, system, user acceptance, documentation, training, code control, structure and plan, assess, report, control, conclude, proposal, charter, work plan, milestones, scope change log, issues management log, risk management log, weekly status report, 5 key charts, customer feedback, admin closure.

Project Team Performance Improvement Management Sample PDF
The following slide showcases team performance improvement chart to increase productivity of workers. The plan includes details related to participants, review period, team responsibilities, supervisor and senior manager roles. Pitch your topic with ease and precision using this Project Team Performance Improvement Management Sample PDF. This layout presents information on Team Responsibilities, Senior Manager Responsibility, Team Performance Evaluation. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Project Management And Process Framework Designs PDF
The following slide showcases framework of planning, monitoring and evaluation. It includes key steps like setting goals, defining results map, planning for monitoring and evaluation, implementing and using monitoring and managing using evaluation. Persuade your audience using this Project Management And Process Framework Designs PDF. This PPT design covers five stages, thus making it a great tool to use. It also caters to a variety of topics including Evaluation, Planning, Monitoring. Download this PPT design now to present a convincing pitch that not only emphasizes the topic but also showcases your presentation skills.

Website Development Project Timeline Model Background PDF
The following slide depicts the website development timeline to establish goals and achieve final results. It includes activities such as research, plan, display frames, finalize mock, code. Collaborate theme, review meeting etc. Showcasing this set of slides titled Website Development Project Timeline Model Background PDF. The topics addressed in these templates are Plan, Display Frames, Finalize Mock. All the content presented in this PPT design is completely editable. Download it and make adjustments in color, background, font etc. as per your unique business setting.

Project Management Ppt PowerPoint Presentation Complete Deck
If designing a presentation takes a lot of your time and resources and you are looking for a better alternative, then this Project Management Ppt PowerPoint Presentation Complete Deck is the right fit for you. This is a prefabricated set that can help you deliver a great presentation on the topic. All the twenty one slides included in this sample template can be used to present a birds-eye view of the topic. These slides are also fully editable, giving you enough freedom to add specific details to make this layout more suited to your business setting. Apart from the content, all other elements like color, design, theme are also replaceable and editable. This helps in designing a variety of presentations with a single layout. Not only this, you can use this PPT design in formats like PDF, PNG, and JPG once downloaded. Therefore, without any further ado, download and utilize this sample presentation as per your liking.

Software Implementation Project Code Churn Introduction PDF
This slide represents code churn which helps managers in noticing when deadline is at risk and identification of problematic code areas. It includes details related to strategies to prevent high code churn rates. This Software Implementation Project Code Churn Introduction PDF from Slidegeeks makes it easy to present information on your topic with precision. It provides customization options, so you can make changes to the colors, design, graphics, or any other component to create a unique layout. It is also available for immediate download, so you can begin using it right away. Slidegeeks has done good research to ensure that you have everything you need to make your presentation stand out. Make a name out there for a brilliant performance.

Roadmap Diagram For Project Analysis Powerpoint Slides
You can use this PPT template as a timeline for business development project. This business timeline slide contains graphics of linear circles. Chart the course you intend to take with this slide.

Business Framework Project Management Charts PowerPoint Presentation
This diagram displays purchasing process flow chart. Use this diagram, in your presentations to display finance and accounting in marketing. This diagram will enhance the quality of your presentations.

Business Framework Project Management Chart PowerPoint Presentation
This diagram displays purchase funnel template. This diagram may be used to depict research and analyzing market in your presentations. This diagram will make your presentations interesting.

Business Framework Project Management Matrix PowerPoint Presentation
This diagram displays profitability ratio calculation template. Use this diagram in business and marketing presentations to depict profit ratio. This diagram will enhance the quality of your presentations.

Implementing Task Intake For Project Clipart PDF
The slide illustrates various steps to market a new product. It includes submission of request, reviewing request and the final decision. Pitch your topic with ease and precision using this Submit Request, Review Request, Decision. This layout presents information on Submit Request, Review Request, Decision. It is also available for immediate download and adjustment. So, changes can be made in the color, design, graphics or any other component to create a unique layout.

Project Amounts Business PowerPoint Template 0610
growing height coin towers in a row behind a growth chart

Project Closure Activities In Project Management Ppt PowerPoint Presentation Complete Deck With Slides
This is a project closure activities in project management ppt powerpoint presentation complete deck with slides. This is a one stage process. The stages in this process are business, project, management, analysis, planning.

Project Work Plan Project Execution Plan Ppt PowerPoint Presentation Slide Download
This is a project work plan project execution plan ppt powerpoint presentation slide download. This is a four stage process. The stages in this process are project work, plan project, execution plan, management, business.

Project Work Plan Project Execution Plan Template 1 Ppt PowerPoint Presentation Layouts Themes
This is a project work plan project execution plan template 1 ppt powerpoint presentation layouts themes. This is a six stage process. The stages in this process are january, february, march, april, may.

Project Planning And Scheduling Tracking Project Deliverables Ppt Powerpoint Presentation Inspiration Maker
This is a project planning and scheduling tracking project deliverables ppt powerpoint presentation inspiration maker. This is a three stage process. The stages in this process are project management, program governance, governance model, project approach.

Project Management Budget Design Project Delivery Ppt PowerPoint Presentation Gallery Slide
This is a project management budget design project delivery ppt powerpoint presentation gallery slide. This is a three stage process. The stages in this process are project delivery, project management, planning, marketing, strategy.

KPI Dashboard To Monitor Project Status Real Estate Project Funding Icons PDF
Following slide illustrates KPI dashboard for monitoring the project performance. Kips covered in the dashboard are project progress and task status, project health and project timeline.Deliver and pitch your topic in the best possible manner with this KPI Dashboard To Monitor Project Status Real Estate Project Funding Icons PDF. Use them to share invaluable insights on Project Management, Dashboard, Project Progress and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Effective Project Management With Key Milestones Project Scope Statement Sample PDF
This slide shows the project scope statement or project charter which includes title of project, project plan, objectives, high level requirement and cost estimate. Presenting effective project management with key milestones project scope statement sample pdf to provide visual cues and insights. Share and navigate important information on one stages that need your due attention. This template can be used to pitch topics like estimated project cost, project objective, project manager, project plan. In addtion, this PPT design contains high resolution images, graphics, etc, that are easily editable and available for immediate download.

Project Management Outline For Schedule Performance Index Project Management Framework Diagrams PDF
This slide provides the glimpse about the project management framework and knowledge areas wherein focus in on different process areas. Deliver an awe inspiring pitch with this creative project management outline for schedule performance index project management framework diagrams pdf bundle. Topics like project integration management, project scope management, project time management, project quality management can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

How To Effectively Manage A Construction Project Project Management Dashboard Guidelines PDF
The following slide displays the project management dashboard that tracks multiple activates of the project. It highlights the project launch date, the overdue task and project budget. Deliver and pitch your topic in the best possible manner with this how to effectively manage a construction project project management dashboard guidelines pdf. Use them to share invaluable insights on planning, design, commissioning, project budget and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Scope Management Deliverables Project Scope Statement Or Charter With Objectives And Cost Estimate Structure PDF
This slide shows the project scope statement or project charter which includes title of project, project plan, objectives, high level requirement and cost estimate. Deliver an awe inspiring pitch with this creative project scope management deliverables project scope statement or charter with objectives and cost estimate structure pdf bundle. Topics like project manager, project plan, project scope description, project objective, high level requirements can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Project Organizing Playbook Addressing Project Budget Plan To Track Cost Management Microsoft PDF
This slide provides information regarding project budget plan to allow project managers to estimate total cost of project. Deliver and pitch your topic in the best possible manner with this project organizing playbook addressing project budget plan to track cost management microsoft pdf. Use them to share invaluable insights on project budget, project manager, key activities and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Efficient Ways For Successful Project Administration Project Status Report With Executive Summary Topics PDF
This slide shows the project status report which includes reporting period, project title, project manager, etc. with project milestones status review.Deliver an awe inspiring pitch with this creative Efficient Ways For Successful Project Administration Project Status Report With Executive Summary Topics PDF bundle. Topics like Project Milestone Status Review, Executive Summary, Reporting Period can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Real Estate Development Project Financing KPI Dashboard To Monitor Project Status Themes PDF
Following slide illustrates KPI dashboard for monitoring the project performance. KPIs covered in the dashboard are project progress task status, project health and project timeline.Deliver and pitch your topic in the best possible manner with this Real Estate Development Project Financing KPI Dashboard To Monitor Project Status Themes PDF. Use them to share invaluable insights on Management Dashboard, Project Progress, Resource Plan and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Organizing Action Plan For Successful Project Management Factors That Influence Success Of Project Microsoft PDF
This slide shows the factors that influence project success that covers project understanding, competent project team, risk management, realistic time and budget forecasts, etc.Deliver and pitch your topic in the best possible manner with this organizing action plan for successful project management factors that influence success of project microsoft pdf Use them to share invaluable insights on project understanding, competent project team, communication and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Managing Project Communication Addressing Project Team With Key People Involved Topics PDF
This slide provides information regarding the key people involved in project such as sponsor, senior management, steering committee, project specialist, project manager, etc. Deliver and pitch your topic in the best possible manner with this Managing Project Communication Addressing Project Team With Key People Involved Topics PDF. Use them to share invaluable insights on Project Manager, External Resources, During Project and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Construction Project Playbook Ongoing Construction Project Progress Tracking Dashboard Ppt Show Styles PDF
This slide provides information regarding ongoing construction project progress tracking dashboard along with details such as project status, project type, project progress, etc. Deliver an awe inspiring pitch with this creative construction project playbook ongoing construction project progress tracking dashboard ppt show styles pdf bundle. Topics like ongoing construction project progress tracking dashboard can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Construction Project Playbook Risk Mitigation Plan To Manage Key Construction Project Concerns Ppt Inspiration Sample PDF
This slide provides information regarding risk mitigation plan to detect and manage key construction project concerns for successful project completion by limiting uncertainties associated with project. Deliver an awe inspiring pitch with this creative construction project playbook risk mitigation plan to manage key construction project concerns ppt inspiration sample pdf bundle. Topics like severity, risk impact, project impact, construction project can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Efficient Ways For Successful Project Administration Project Scope Statement Or Charter Diagrams PDF
This slide shows the project scope statement or project charter which includes title of project, project plan, objectives, high level requirement and cost estimate.Deliver and pitch your topic in the best possible manner with this Efficient Ways For Successful Project Administration Project Scope Statement Or Charter Diagrams PDF Use them to share invaluable insights on High Level Requirements, Project Objective, High Level Requirements and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Effective Project Management With Key Milestones Project Status Report With Executive Inspiration PDF
This slide shows the project status report which includes reporting period, project title, project manager, etc. with project milestones status review. Deliver an awe inspiring pitch with this creative effective project management with key milestones project status report with executive inspiration pdf bundle. Topics like budget, executive summary, project plan can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Project Management Development Tracking Key Milestones To Ensure Project Progress Template PDF
This slide provides information regarding project milestones tracking through visual mapping of key tasks in timeline. Deliver and pitch your topic in the best possible manner with this Project Management Development Tracking Key Milestones To Ensure Project Progress Template PDF. Use them to share invaluable insights on Project Closure, Project Control, Project Execution, Project Planning and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Techniques For Timely Project Estimated Impact On Project Success Rate Ideas PDF
This slide focuses on impact of project management plan on success rate which compares project success due to efficient scheduling, capable project team, risk mitigation strategies, communication planning, etc. Deliver an awe inspiring pitch with this creative Techniques For Timely Project Estimated Impact On Project Success Rate Ideas PDF bundle. Topics like Project Success Rate, Efficient Scheduling, Planning Tasks can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Budget Cost Project Plan Period Of Project Cost Breakdown Performance Analysis Demonstration PDF
Deliver and pitch your topic in the best possible manner with this budget cost project plan period of project cost breakdown performance analysis demonstration pdf. Use them to share invaluable insights on strategic planning, project development, execution of project, project maintenance, analysis, reporting and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Budget Cost Project Plan Period Of Project Cost Breakdown Performance Planing Brochure PDF
Deliver an awe-inspiring pitch with this creative budget cost project plan period of project cost breakdown performance planing brochure pdf bundle. Topics like strategic planning, project development, execution of project, project maintenance, analysis, reporting can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Budget Cost Project Plan Project Cost Breakdown Brief Ppt Model Clipart Images PDF
Deliver an awe-inspiring pitch with this creative budget cost project plan project cost breakdown brief ppt model clipart images pdf bundle. Topics like budget details, duration of project, target audience, project scope, project objectives, introduction or overview can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Organizing Action Plan For Successful Project Management Depicting Impact On Project Success Rate Formats PDF
This slide focuses on impact of project management plan on success rate which compares project success due to efficient scheduling, capable project team, etc.Deliver an awe inspiring pitch with this creative organizing action plan for successful project management depicting impact on project success rate formats pdf bundle. Topics like depicting impact on project success rate can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Project Time Management To Enhance Productivity Estimated Impact On Project Success Rate Introduction PDF
This slide focuses on impact of project management plan on success rate which compares project success due to efficient scheduling, capable project team, risk mitigation strategies, communication planning, etc.Deliver an awe inspiring pitch with this creative Project Time Management To Enhance Productivity Estimated Impact On Project Success Rate Introduction PDF bundle. Topics like Project Success, Time Management, Improving Success can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Pi Project Planning For Project Activities Scheduling Icon Ppt Professional Layouts PDF
Presenting Pi Project Planning For Project Activities Scheduling Icon Ppt Professional Layouts PDF to dispense important information. This template comprises three stages. It also presents valuable insights into the topics including Pi Project Planning, Project Activities, Scheduling Icon. This is a completely customizable PowerPoint theme that can be put to use immediately. So, download it and address the topic impactfully.

Project Administration Bundle Project Resource Planner For Scheduling And Optimization Sample PDF
Purpose of the following slide is to show the project resource planner as it Highlights the Four Major Steps in effective project report management, these steps include Understanding Project Role, Resource Schedule, Resource Optimization and Measuring Resource. This is a Project Administration Bundle Project Resource Planner For Scheduling And Optimization Sample PDF template with various stages. Focus and dispense information on four stages using this creative set, that comes with editable features. It contains large content boxes to add your information on topics like Project Plan, Resource Optimization, Resource Capacity. You can also showcase facts, figures, and other relevant content using this PPT layout. Grab it now.

Time Management Techniques For Successful Project Preparing Project Task List To Track Progress Structure PDF
This slide represents the project task list to track progress and create schedule accordingly which includes registration date, description, responsible person, due date, status and other comments.Deliver an awe inspiring pitch with this creative Time Management Techniques For Successful Project Preparing Project Task List To Track Progress Structure PDF bundle. Topics like Project Stakeholders, Acceptance Criteria, Project Stakeholders can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Playbook For Project Administrator Checklist To Track Project Lifecycle Management Activities Ideas PDF
This slide provides information regarding project managers checklist to track project lifecycle management activities across project phases in terms of project initiation, planning, execution , monitoring and closure. Presenting playbook for project administrator checklist to track project lifecycle management activities ideas pdf to provide visual cues and insights. Share and navigate important information on two stages that need your due attention. This template can be used to pitch topics like project initiation, project planning, project execution In addtion, this PPT design contains high resolution images, graphics, etc, that are easily editable and available for immediate download.

Construction Project Playbook Procurement Plan For Project Requirements Management Ppt Model Summary PDF
This slide provides information regarding procurement plan for project requirements management including details about procurement method selection, delivery date, status, etc. Deliver an awe inspiring pitch with this creative construction project playbook procurement plan for project requirements management ppt model summary pdf bundle. Topics like project scope, project justification, project manager can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Organizing Action Plan For Successful Project Management Project Closure Checklist To Track Status Structure PDF
This slide shows the project closure checklist to track status which focuses on description of task, status, completion date and notes.Deliver and pitch your topic in the best possible manner with this organizing action plan for successful project management project closure checklist to track status structure pdf Use them to share invaluable insights on project head responsibility, project manager supervision required, measures for projects and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Management Outline For Schedule Performance Index Software Project Management Dashboard Infographics PDF
This slide provides the glimpse about the software project management dashboard which covers project budget, workload, overdue tasks, upcoming deadlines, etc. Deliver and pitch your topic in the best possible manner with this project management outline for schedule performance index software project management dashboard infographics pdf. Use them to share invaluable insights on planning, design, development, testing, project launch date and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Scope Management Deliverables Project Milestones With Target Starting And Completion Date Formats PDF
This slide shows the project milestones project panning, machine installation, billboard installation, etc. with their date of starting and date of completion. Deliver and pitch your topic in the best possible manner with this project scope management deliverables project milestones with target starting and completion date formats pdf. Use them to share invaluable insights on milestone, target start date, project planning and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Administration Planning Project Issue Tracker Priority Ppt PowerPoint Presentation File Graphic Images PDF
This slide provides the glimpse about the project issue tracker which focus on track list, project details and evaluate the priority of the projects. Deliver and pitch your topic in the best possible manner with this project administration planning project issue tracker priority ppt powerpoint presentation file graphic images pdf. Use them to share invaluable insights on project issue tracker and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Work Plan Project Execution Plan Template Ppt PowerPoint Presentation Styles
This is a project work plan project execution plan template ppt powerpoint presentation styles. This is a seven stage process. The stages in this process are project, management, business, marketing, success.

Initiation To Agile Project Administration Software Development Project Management Dashboard Background PDF
This slide shows software development project management dashboard. It covers status of planning, design, development, testing project launch date, project budget, overdue tasks, workload and upcoming deadlines. Deliver an awe inspiring pitch with this creative initiation to agile project administration software development project management dashboard background pdf bundle. Topics like software development project management dashboard can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Project Manager Project Team Template Ppt PowerPoint Presentation Professional Graphic Tips
This is a project manager project team template ppt powerpoint presentation professional graphic tips. This is a four stage process. The stages in this process are functional manager, functional manager, functional manager, project manager.

Project Administration Playbook Addressing Project Budget Plan To Track Cost Management Elements PDF
This slide provides information regarding project budget plan to allow project managers to estimate total cost of project. Deliver an awe inspiring pitch with this creative project administration playbook addressing project budget plan to track cost management elements pdf bundle. Topics like addressing project budget plan to track cost management can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Project Scope Management Playbook Addressing Project Budget Plan To Track Cost Management Infographics PDF
This slide provides information regarding project budget plan to allow project managers to estimate total cost of project. Deliver an awe inspiring pitch with this creative Project Scope Management Playbook Addressing Project Budget Plan To Track Cost Management Infographics PDF bundle. Topics like Project Budget Template, Reduce Overall Cost, Cost Management can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Playbook For Project Product Administration Addressing Project Budget Plan To Track Cost Management Inspiration PDF
This slide provides information regarding project budget plan to allow project managers to estimate total cost of project. Deliver an awe inspiring pitch with this creative Playbook For Project Product Administration Addressing Project Budget Plan To Track Cost Management Inspiration PDF bundle. Topics like Overbudget Underbudget, Reductions Initiatives, Project Template can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Building Projects Risk Landscape Key Members Involved In Project Team Mockup PDF
This slide aims to present project team structure with key people involved such as senior project manager, project managers and superintendent etc. Deliver and pitch your topic in the best possible manner with this building projects risk landscape key members involved in project team mockup pdf. Use them to share invaluable insights on key members involved in project team and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Playbook For Successful Project Management Determine Role Of Project Manager Template PDF
This slide provides information regarding the role of project manager in project management and act as information distributor in order to ensure easy workable conditions. Deliver an awe inspiring pitch with this creative Playbook For Successful Project Management Determine Role Of Project Manager Template PDF bundle. Topics like Project Manager, Ensures Project, Internal Actions can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Strategies To Enhance Project Management Process Depicting Impact On Project Success Rate Guidelines PDF
This slide focuses on impact of project management plan on success rate which compares project success due to efficient scheduling, capable project team, etc. Deliver an awe inspiring pitch with this creative Strategies To Enhance Project Management Process Depicting Impact On Project Success Rate Guidelines PDF bundle. Topics like Planning, Project Team, Success Rate can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Effective Initiation Of Information Technology Project Possible Project Risks And Their Mockup PDF
This slide portrays information about possible project risk occurrence likelihood and their significance. It includes sections namely possible risk, project phase, impact, likelihood and significance. Deliver an awe inspiring pitch with this creative effective initiation of information technology project possible project risks and their mockup pdf bundle. Topics like possible risk, project phase, impact low, medium, high, project planning can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.

Strategies To Enhance Project Management Process Defining Scope Statement For Project Management Elements PDF
This slide represents the scope statement of project which covers project name, sponsor, manager, date of approval, scope description, deliverables, acceptance criteria, etc. Deliver and pitch your topic in the best possible manner with this Strategies To Enhance Project Management Process Defining Scope Statement For Project Management Elements PDF. Use them to share invaluable insights on Project Sponsor, Project Team, Measured and impress your audience. This template can be altered and modified as per your expectations. So, grab it now.

Project Scope Management Playbook Addressing Project Team With Key People Involved Elements PDF
This slide provides information regarding the key people involved in project team such as sponsor, senior management, steering committee, project specialist, project manager, etc. Deliver an awe inspiring pitch with this creative Project Scope Management Playbook Addressing Project Team With Key People Involved Elements PDF bundle. Topics like Project Manager, System Analyst, System Administrator can be discussed with this completely editable template. It is available for immediate download depending on the needs and requirements of the user.